Skip to content
Menu

The Project

Venkatesh Skydove: everything that has actually been released

Six figures exist for this project. Price, carpet areas, plans, amenities, possession and the RERA number do not. Here is the complete list, with what each gap means.

Venkatesh Skydove Sales · 10 August 2026 · 6 min read

Seven things that become publicly checkable when a project is registered

If you have read three pages about Venkatesh Skydove you have probably seen a price band, carpet areas, an amenity list and a possession date.

None of that has been released. This is the complete list of what has.

Released

  • Land parcel. Seven acres.
  • Towers. Eleven.
  • Homes. 1,050.
  • Configurations. 2, 3 and 4 BHK.
  • Structure. Two basements, a lower ground, an upper ground, three podium levels and 23 floors.
  • Commercial. Shops and offices form part of the same development.

Six items. All of them came to us from the developer through our channel partnership on 10 August 2026, which is the closest thing to a first-party statement that exists for this project.

Not released

  • MahaRERA registration. None. The project is not registered.
  • Carpet areas. Not being published at this stage.
  • Price list. None announced.
  • Floor plans and master plan. None issued.
  • Amenity schedule. None issued.
  • Possession date. None published.
  • Renders, elevations and brochure. None exist.
  • Street address or plot location. Not published by anybody.

What each gap actually means

No registration is the important one

It is not a missing field. Under Section 3 of the RERA Act a promoter may not advertise, market, book or sell in an unregistered project. It also means no sanctioned layout, no declared completion date and no filed areas exist in public. That is set out in a separate piece.

No price is normal at this stage

Pre-launch pricing genuinely goes to registered buyers before it reaches the listing portals, and that window is real. What is not real is a price band published by a site that has no cost sheet.

No address is the one nobody admits

Two competing pages publish distance tables for this project. A distance needs a point to measure from, and no plot location has been published. The reasoning is in the piece on the missing distance table.

Two seven-acre schemes on Sinhagad Road compared by number of homes
What the six released figures do tell you. Seven acres holding 1,050 homes is roughly twice the density of the same developer's neighbouring scheme. · Illustration

What you can still work out

More than the short list suggests. Six figures give you the density, roughly four homes per floor, six levels of parking under a deck, a building tall enough to cross the seventy metre fire threshold, and a scheme that must be built in phases.

All of that is in the piece on the arithmetic. It is a lot to know about a project with no brochure.

How this page will change

Every item moves from the second list to the first on the day the developer issues it, and not before. Nothing gets promoted because a listing site published it, and nothing gets filled in from a comparable project.

If you want each item the day it lands rather than the week the portals pick it up, leave us your number.

Sources

More updates

All updates
Two seven-acre schemes on Sinhagad Road compared by number of homes

The Project

Seven acres, eleven towers, 1,050 homes: doing the arithmetic

The three numbers the developer has released tell you more about how Venkatesh Skydove will feel to live in than any amenity list would. Here is what they add up to.

11 August 2026 · 7 min read

Seven acres, eleven towers, 1,050 homes: doing the arithmetic
A section through a tower showing two basements, lower ground, upper ground, three podiums and 23 floors

The Project

Two basements, three podiums, 23 floors: reading the structure

The one line of specification Skydove has released describes six levels of parking under a raised deck. That decides what the ground floor of your daily life looks like.

9 August 2026 · 7 min read

Two basements, three podiums, 23 floors: reading the structure
Arithmetic showing eleven towers of 23 floors giving about four homes per floor

The Project

2, 3 and 4 BHK on Sinhagad Road: what the mix tells you

The configuration mix is confirmed and the carpet areas are not being published. That combination still says a good deal about who this project is being built for.

8 August 2026 · 6 min read

2, 3 and 4 BHK on Sinhagad Road: what the mix tells you

Be first when the numbers land

Carpet areas, the price list and the floor plans go to registered buyers before they reach the portals.

Call Now

Enquiry

Share your details and our team will get back to you.

By submitting you consent to be contacted about this project, including on a number registered with the National Do Not Call Registry.